Fire Mutual Aid

View Original

DISPATCH CENTER RENOVATION UPDATE

All photos by Deputy Sangermano. March 19, 2014 - Electrical Contractor Herb Hurlburt (35C3) boring holes in the floor where one of the new console positions will be located. On left is Chief Phil Tirrell.

March 21, 2014 - Insulation going in. Notice the front entry door is still being used in this photo.

March 27, 2014 - Sheetrock going up. Front entry door is still in use.

April 1, 2014 - Sheetrock up and paint primer going on. Notice the entry door is now gone. The raised floor on the left side of photo will be the supervisor's console position. Four other console positions will be located in front of the supervisor's position. Total Square footage of the new dispatch center will be 1500 square feet compared to our present dispatch center that is 300 square feet.